PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting the stone panels at the East Elevation 4.jpg Erecting the stone panels at the East Elevation 5.jpg Erecting the stone panels at the East Elevation 6.jpg Installed electrical split wire for the 2nd floor motorized damper.jpg Installed pipe hangers at the 2nd floor Facing West.jpg Interior metal framing at the 2nd floor Facing South.jpg Interior metal framing at the UCIA 2nd floor Facing South.jpg Laying our block around the UCIA roof.jpg 4th floor duct work delivery Facing East.jpg
Previous pageNext page Installed pipe hangers at the 2nd floor Facing West
Installed pipe hangers at the 2nd floor Facing West